Friday, May 12, 2017
Subsea Equipment Transported Across Houston
Hansa Meyer Heavy Haul & Rigging transported two loads across Houston, load #1 weighed 818,984 lbs and load #2 427,200 lbs. Load #1, a lower stack, was transported via Hansa Meyer's 14 line Goldhofer DR with Western Star pull and push trucks. The cargo was escorted by 5 police escorts and arrived 1 full day ahead of schedule. Load #2, a LMRP, was transported using a 4 drop deck 8 line SL with Western Star Prime Mover (pull only) over the course of 1 day. Very impressive and a well done job by the Hansa Meyer Heavy Haul & Rigging team. Please enjoy the videos and pictures of this project below.
Subscribe to:
Posts (Atom)