Image

Friday, April 28, 2017

Direct Discharge of Steel Mill Products

Originating from Europe, and partnering with Hansa Meyer Germany, Hansa Meyer Heavy Haul & Rigging received and transported 4 units of steel mill products to Calvert, AL. All units were directly discharged from the ship, with the exception of the largest unit that was picked from the ship onto a floating crane and then placed onto 10 lines of Goldhofer THP/DR. In addition to the cargo above, there were also 3 flatbeds of accessories all of which were successfully transported. Please enjoy the below pictures of this project. 


Direct discharge onto TK 120


Sizing Sled without Shaft - 128,616 lbs - 16'8" x 12'8" x 7'9"



Tool Sled 1 - 55,000 lbs - 12'8" x 8'0" x 7'2"

Tool Sled 2

Sizing Sled with Shaft - 221,208 lbs - 16'8" x 12'8" x 7'9"

Placing of cargo onto 10 lines of Goldhofer THP/DR via floating crane

En route to final destination
As always, thank you for reading our blog and we welcome any comments.